Trade War

Home News & Analysis Trade War

Potential impacts of India’s 20% BCD on solar cells, modules

To read the full content, please reach us to become a member of PV InfoLink.

According to the Finance Bill and D.O.F. No. 334/2/2020-TRU released by the Indian government on Feb. 1 and 2, the Budget 2020 proposed the following amendments:

1.       Splitting the earlier tariff item of solar cells

Splitting the earlier tariff item of solar cells

2.       The maximum BCD that can be levied is 20%

The existing safeguard duty for solar cells and modules will end on July 29. The Budget 2020 proposed to raise the basic customs duty (BCD) from zero to 20% on both tariff items, namely solar cells, whether assembled in modules or panels. It’s worth noting that the BCD applies to imports of solar products from all countries.

The basic customs duty (BCD)

Impact analysis by PV InfoLink:

Current status of India market

India is the third largest solar market following China and the U.S. India’s module demand stood at 10 GW in 2019, with DCR projects, which require the use of domestic made cells and modules, and non-DCR projects constituting the demand. DCR projects contributed around 1.5 GW of demand, while non-DCR projects made up 8.4 GW. For non-DCR projects, China exported 5.8 GW of modules and 16 GW of cells to India in 2019. In other words, Chinese solar products accounted for more than 80% of the market in India.

Before the Chinese New Year, prices in the Indian market fell to USD 0.23/W. The market, which has high demand for multi-Si products, started picking up when the safeguard duty was reduced at the end of January. At present, the Indian-made modules are offered for a spot price of USD 0.23/W. However, the short-range price trend is unclear amid coronavirus outbreak. 

With 15% SGD in place, it’s still profitable for Chinese manufacturers to export modules to India or assemble modules in Southeast Asia and then ship to India. From a cost perspective, Indian manufacturers would still pivot to purchasing modules from China.

Impacts of BCD

According to the current customs duty structure, India’s safeguard duty has been reduced to 15% for the period from Jan. 31 through July 29, and it will step down on July 30. From July 30 onwards, the 20% of BCD might be imposed. However, the impact of BCD is limited given a plunge in prices across the multi-Si supply chain at the end of 2019 and the deadline of 2022 target of achieving 100 GW installed capacity is approaching. Therefore, PV InfoLink projects that India’s module demand will sit at 14.5 GW this year.

Global PV demand

Given that BCD might apply to all countries, the estimated costs here is for all imported products. The costs of cells and modules here are calculated under the scenario that both are imposed a 20% of BCD; nevertheless, the Budget 2020 proposed to split the tariff items for solar products, so it appears likely that cells and modules will be imposed different tariff rates.

Analysis of cost after BCD

*Conventional multi-Si modules still dominates the Indian market now, so the estimated costs is calculated based on conventional multi-Si module costs.

*The cell costs of 2020 is calculated based on an anticipation that wafer prices will decrease to USD 0.190/pc by August and cell costs will have been lower by then.

The estimated costs show that Thailand and Vietnam, which are not subject to tariffs and have established economics of scale, will no longer enjoy costs advantage. Although imported products may be imposed BCD, prices of Chinese multi-Si products still have a competitive edge because of stocked inventory and a drop in prices occurred earlier in China. So, using Chinese products can reach the lowest costs in India.

India’s order of preference based on costs advantage is as follows:

1.    Importing modules directly from China: The domestic capacity is unable to fulfil the 14 GW+ of module demand this year, so India still relies on module imports from China. 

2.    Capacities in Southeast Asia: Manufacturing lines have been converted from multi-Si to mono-Si, and taking profits into consideration, the capacities are mostly fulfilling demand in the U.S. market.

3.    Capacities in India: India has around 12.7 GW of module capacity and 2.7 GW of cell capacity.

If BCD is imposed right after the end of SGD, costs of modules will be driven up. Despite of that, Indian developers will still purchase modules from China. With costs increasing after BCD and prices of multi-Si modules remaining low, importing multi-Si cells and modules can hardly generate profits.

2020 outlook: Conclusion

As the Indian government plays an active role in protecting the local PV industry, it is likely to impose the BCD after the safeguard duty ends at the end of July. If the BCD is imposed, India will expedite its module inventory draw during the supposedly weak Q2, in anticipation of the price increase brought by the duty. An inventory draw is expected in July if the BCD comes into force on July 30. The market will then slow in August and September, with demand hitting the lowest level of the year in Q3. Demand will pick up in Q4, when high season returns.

Comparing the estimated production costs of cells and modules between India, China, and Southeast Asia countries, it’s difficult for India to compete with cells and modules manufactured China and Southeast Asia even if the BCD is imposed at the end of July. So, apart from DCR projects that require the use of domestic made modules, developers of non-DCR projects will continue to use Chinese modules and tariff-free cells and modules from Southeast Asia.

Given the 20% BCD proposed by the Budget 2020, prices for multi-Si modules may increase slightly in August. Since buyers will finish drawing module inventory before the tariff rate changes, it’s expected that August to September will see the weakest demand of the year. Moreover, considering the costs and profits of multi-Si modules now, their prices are not likely to decrease further and rebound; prices are expected to remain low.

Previous Go Back Next

欢迎您光临PV InfoLink网站(http://www.pvinfolink.com,以下简称“本网站”),请您详阅下方的本网站的使用条款、以保障双方权益,若使用本网站则表明您已知悉并完全接受这些条款。

§ 1 免责声明

本网站合法获取信息,并尽可能以可靠、准确、完整的信息为基础,但不保证本网站信息的绝对准确性和绝对完整性,亦不对任何人的市场操作、投资建议负任何责任。PV InfoLink保留随时补充、修订或更改有关信息的权利,但并不保证随时发布。

 § 2 版权声明

本网站中的商标、名称、版面设计、自有文章、图片、图表等内容之版权归PV InfoLink所有。对于内容中所含的版权和其他所有权声明,使用者应予以尊重并在其转载、副本中予以保留。如果网站内容无权利声明,并不代表本网站对其不享有权利,也不意味着本网站不主张权利,使用者应根据诚信原则尊重该内容的合法权益并进行合法使用。

§ 3 转载及链接

本网站出于促进业界同仁思想交流和研究探讨之目的,可能包含转载文章或连接到第三方网页上的链接。转载文章所阐述的观点只代表该作者自身观点,本网站转载并不代表赞成或反对其观点。另外,本网站对外部链接并不负审查义务,不担保其准确性及完整性。在收集原始素材时,PV InfoLink尽可能注明文章的作者和来源,如文章作者或版权所有者对此存有异议,并不希望本网站引用、转载,请联系我们,本网站将立即予以删除。

§ 4 拒绝提供担保

本网站不提供任何明示或暗示的担保,包含但不限于商业适售性、特定目的之适用性及未侵害他人权利。

本网站之目的为提供使用者参考使用,使用者须自行判断该等资料之即时性及适用性。若有任何交易或投资决定,皆由使用者自行承担相关责任。

若使用者透过本网站与其他厂商进行商品或服务之买卖、或各种交易行为,此时仅使用者与厂商间有契约关系存在,本网站并不介入或参与。如该商品或服务有任何瑕疵或纠纷时,请使用者与其契约方径行联络解决,本网站对此不负任何担保责任

本使用条款之订立、修改、更新及最终解释权均属PV InfoLink所有。若您对于本使用条款或本网站有任何问题或建议,欢迎来信service@pvinfolink.com

Welcome to PV InfoLink website (http://www.pvinfolink.com, hereinafter referred to as “this website”). Please read this terms of use agreement carefully to protect the interests of both parties. By accessing this website, you know and fully agree with these terms.

§1 Disclaimer

Information on this website is legally obtained and is based on reliable, accurate, and complete information. But absolute accuracy and completeness is not guaranteed. We assume no responsibility for anyone’s market operation or investment advice. PV InfoLink reserves the right to add, revise, or alter website information anytime, but information will not be guaranteed to be published all the time. 

§2 Copyright statement

The copyright of trademark, name, website layout, articles, photos, charts, etc. on this website are the properties of PV InfoLink. For the copyright and other proprietary statement contained in the content, users should show the respect and cite sources when sharing the article. If the website has no copyright statement, it does not mean that its contents are not protected. Users should respect the legitimate rights for use based on the principle of integrity.

§3 Share and link

This website may share articles or put subcontractor’s link on this website for the purpose of facilitating peer exchange and research. The point of view for the shared article is author’s own point of view. This website does not represent in favor or against the author’s point of view. In addition, this website does not have an obligation to review external links and does not guarantee its accuracy and completeness. For the collection of original sources, we will try to cite the author and source as much as possible. If the author or copyright owner has any opinions and do not want this website to refer or share their content, please contact us. The article will be removed immediately. 

§4 Refuse to provide warranty

This website does not provide any express or implied warranties, including but not limited to commercial suitability, fitness for a particular purpose, and non-infringement of the rights of others.

This website is for reference only. Users should determine the immediacy and applicability of such information themselves and have to be responsible for any transaction or investment decisions made.

If users conduct trade transactions with other manufacturers through this website, only the user and the manufacturer have a contractual relationship. This website is not involved in it. If the product or service has any flaws or disputes, users will have to contact the contractor. This website will assume no responsibility for such matters.

The making, modification, renewal, and final interpretation of this Terms of Use are the properties of PV InfoLink. If you have any questions or suggestions regarding this Terms of Use or this website, please contact us at service@pvinfolink.com.

研究方法及免责声明

PV InfoLink的现货价格主要来自平时与业界的面谈、
电话访问或通讯软体等沟通渠道讨论所取得,参考超过100家厂商之信息。
主要取市场上最常成交的众数数据作为均价(并非加权平均值)、
但每周根据市场分为略有微调,且加上PV InfoLink专业分析群的市场预测。
我们力求信息的全面性与完整性,惟此信息仅供参考使用,
我们不对任何人的市场操作、投资建议负任何责任。

PV InfoLink gathers price information from face-to-face/phone interviews and other ways of communication with more than 100 PV companies. We get our average price from the most common transactional data in the market (not weighted average), but prices are slightly adjusted every week according to market conditions. With PV InfoLink’s professional market forecast, we seek the fullness and completeness of the information, but this information is just for reference. We assume no responsibility for anyone’s market operation or investment advice.